INTELLIGENCE FOR INSURANCE AGENTS

The AI does the prep.
You make the call.

Finsuri reads every policy, renewal, contract and quote the moment it arrives — extracts the terms, builds your client book, and surfaces the gaps. The busywork disappears. The judgement stays yours.

Zero manual entry Email native WhatsApp soon Built for Southeast Asia
FINSURI WorkspaceClientsPipelineAppetiteDocuments
NW
Good morning, Oscar.
Workspace
Sun · 24 May 2026 · All systems live
Action queue · 3 openView all gaps →
Critical Hafiz Construction QBE WICA 14m ago
WICA coverage expires in 19 days — no renewal in progress
Coverage limit shortfall vs MOM statutory requirement
Advisory Bay Logistics AIG PI 1h ago
PI limit SGD 2M below contractual requirement of SGD 5M
Detected in service agreement · Clause 14.3
Active policies
247+12
this month
Renewals · 30d
18
4 untouched
Critical gaps
7+2
across 5 clients
Docs · week
64+18%
vs last week
The status quo

Agents run on memory and goodwill.

You juggle 50–500 active policies across multiple carriers and lines. The data already exists — it's just trapped in documents nobody has time to transcribe.

01 / THE DATA-ENTRY TAX

A third of the day, retyped

30–40% of a producer's time goes to keying schedules into CRMs and spreadsheets that were obsolete the moment they were filled in.

02 / FRAGMENTED EVERYWHERE

Nothing remembers the book

Schedules land on WhatsApp. Renewals by email. Contracts sit in shared drives. No single place holds the whole client picture.

03 / GAPS FOUND TOO LATE

Exposure surfaces at the claim

A shortfall against a contract clause stays invisible until a claim crystallises it — and by then it has become the agent's problem.

How it works

Forward a document.
Finsuri does the rest.

No imports, no onboarding spreadsheet, no forms. The client book builds itself from the documents you already handle.

01

Forward anything

Drop a renewal schedule, policy wording, quote or contract — by email, or straight onto your workspace. WhatsApp forwarding is coming soon.

WIC_Renewal_2026.pdf
02

Finsuri extracts

Terms, limits, dates, carrier and client are parsed and matched to the right record — confidence-scored, with no form to fill.

InsuredHafiz Construction
CarrierQBE
Policy no.POL-2026-PI-8821
Period01 Jul 26 — 30 Jun 27
03

You make the call

Read a plain-English summary, see exactly what changed at renewal, and act on the gaps. Finsuri preps the work — the decision is yours.

Critical1 gap to review
TPL limit insufficient for project contract
The platform

Every job around a policy,
already done for you.

Structured policy review

A three-bullet, client-ready summary of any policy — plus a clear diff against the expiring terms at renewal.

Coverage gap analysis

Runs on every new document. Flags critical and advisory gaps, each one citing the clause or contract it derives from.

Quote comparison

Side-by-side comparison artifacts scoped per line of business — premium, brokerage, limits and terms, normalised.

Submission drafting

Compose a carrier-ready submission from data you've already supplied — per-carrier tabs, clean plain-text body.

Wording Q&A

Ask any policy in your book a plain-English question. Get an answer with the exact clause number cited back.

Market appetite tracker

A self-populating matrix of which carriers are writing what — built passively from your own bound and declined signals.

Where Finsuri earns its keep

It catches the gap
before the claim does.

Gap analysis re-runs the moment anything changes — a new contract, a renewal, an endorsement. Material issues escalate to your workspace; everything else waits quietly in the client record until renewal.

Cited, never asserted

Every finding points to the specific clause or contractual obligation behind it, so you can verify before you raise it.

Severity that means something

Critical gaps escalate to alerts you see at login. Advisory gaps stay in the file for the next renewal conversation.

One click to the fix

Turn any gap into a drafted note to the incumbent carrier — pre-filled with the exposure and the recommended action.

GAPS · 1 CRITICAL · 2 ADVISORY QBE
Critical

TPL limit insufficient for project contract

LTA Contract C-2026-118 requires SGD 10M TPL minimum. Renewal proposes SGD 5M — a material shortfall.

Source
Clause 14.3, C-2026-118
Recommended
Restore SGD 10M limit before binding.
Exposure
SGD 5M gap
Advisory

Faulty design exclusion limits extension

New SGD 750k T&C extension is undermined by Exclusion 7d — design-related failures excluded.

Source
Wording §3.2 vs §7(d)
Recommended
Place separate Inherent Defects cover.
Exposure
Uncertain at claim
From the desk

Producers stopped
doing the busywork.

“By the time I'm off the call with a client, Finsuri has already read the schedule, flagged the two gaps and lined up the renewal. I spend my day advising — not transcribing PDFs into a spreadsheet.”

PM
Priya Menon
Director · Meridian Risk Partners

“It found a TPL shortfall against a construction contract that I'd have caught at renewal — three months too late.”

MT
Marcus Tan
Principal · Tan & Co Advisory

“My client book built itself out of forwarded WhatsApp PDFs. I never opened a single form.”

AR
Aisha Rahman
Senior Broker · Crescent Brokers

“Quote comparisons used to take an afternoon. Now I send a client-ready table before lunch.”

DK
Daniel Koh
Account Exec · Harbourfront Risk

“The wording Q&A answers coverage questions with the clause number attached. I quote authority, not memory.”

WL
Wei Lin
Managing Director · Lin & Galleria

Stop typing.
Start advising.

Be first to run Finsuri on your own book. Join the waitlist and we'll process a handful of your real documents the moment your seat opens.